Now the bureaucratic details:
Date: 12-Mar-2020, 06:00:00 UTC to 17-Mar-2020 06:00:00 UTC
Project: llrSR5 (CPU only)
As with all PG Challenges, only workunits downloaded after the start of the challenge and completed and returned by the end of the challenge are valid (double-check validation not required).
This is the 2nd of 9 challenges this year, ( http://www.primegrid.com/challenge/challenge.php ), the next is a 3 day challenge from 1 Apr to 4 Apr.
This is an LLR project so running with HT off or at 1/2 threads is best. Like all LLR projects it benefits/demands multi-threading.
This is the section of the app_config.xml file that I use for SR5:
Code: Select all
<app>
<name>llrSR5</name> <!-- Sierpinski/Reisel Base 5 -->
<max_concurrent>2</max_concurrent>
<fraction_done_exact>1</fraction_done_exact>
<report_results_immediately>1</report_results_immediately>
</app>
<app_version>
<app_name>llrSR5</app_name>
<plan_class>mt</plan_class>
<cmdline>-t 8</cmdline>
<avg_ncpus>8</avg_ncpus>
</app_version>